FREE GENERATOR SIZE CALCULATOR

Find your
generator.

Answer a few quick questions, or use your equipment ratings. Get a free size guide and compare generators at today's best price.

  • Free to use. Takes less than a minute.
  • Real sizing rules, tailored to your needs.
  • Find the right generator at today’s best price
Prefer to talk to us?1300 308 828

Size calculator

Step 1 of 4

Choose your starting point

SIZE WITH CONFIDENCE

A practical guide to generator sizing

The right generator covers what you need running, handles the equipment starting and suits the way you will use it. These are the checks behind a useful shortlist.

1. Start with running and starting loads

List the equipment that will operate together. Use electrical input watts from its nameplate or manual. Add the running inputs, including quantities. Then check the extra demand when a motor or compressor starts.

If you deliberately start appliances one at a time, allow for the largest individual starting increase on top of the running total. If they may restart together after an outage, include those starting demands together. Neither approach replaces equipment-specific starting information.

The appliance calculator includes clearly marked example values. They help build a first estimate; replace them with the ratings for your actual equipment. A microwave’s cooking output, for example, is different from its electrical input.

2. Keep watts and kVA separate

Watts and kilowatts measure real power: 1,000 W equals 1 kW. kVA measures apparent power. Power factor connects the two.

kW = kVA × power factor

At a stated 0.8 power factor, 10 kVA corresponds to 8 kW. That is an example, not the power factor of every generator or appliance. A product’s advertised kVA cannot be used as its continuous watts rating. Our calculator keeps unknown factors explicit and shows the allowance used.

3. Use the right voltage and phase

For single-phase equipment, apparent power is voltage multiplied by input current. A balanced three-phase calculation uses line-to-line voltage and current per phase.

Single phase: kVA = V × A ÷ 1,000
Balanced three phase: kVA = √3 × V × A ÷ 1,000

For example, 15 A at 240 V is 3.6 kVA before a sizing allowance. Use the voltage on the equipment, rather than swapping between 230/240 V or 400/415 V without checking. A three-phase set’s total rating is not all available from one single-phase outlet. Check phase balance, outlet limits and the intended connection.

4. Check motors and welders properly

A motor’s shaft kW or horsepower describes mechanical output. Its electrical input also depends on efficiency and power factor. Starting demand depends on the motor and its starting arrangement. There is no single multiplier that confirms every pump, compressor, air conditioner or drive.

Use running input current and starting current where available. For a large motor, the complete generator’s starting performance and voltage recovery need checking. A high advertised peak number on its own does not describe that performance.

For welders, use maximum input current and the manufacturer’s generator recommendation. Welding output amps and the plug’s nominal rating are not interchangeable with electrical input demand.

5. Compare the rating you will actually use

RatingWhat to check
Continuous or primeThe appropriate sustained output and the manufacturer’s operating conditions.
StandbyEmergency-use conditions and limitations; it is not automatically a prime rating.
Peak or startingThe available short-term output, its duration and the equipment’s starting requirements.

Leave room for the load and conditions instead of planning to run at the limit. The numerical calculator starts with an editable 20% planning allowance. Heat, altitude, duty cycle, load steps and non-linear equipment can require a different engineering assessment.

6. Plan a safe connection

Operate a fuel-powered generator outdoors, away from openings where exhaust could enter a building. Keep it dry and follow its manual. Never connect it to a wall outlet to feed house wiring.

Building connections need a licensed electrician and a suitable changeover arrangement. The electrician should check the generator, wiring, protection and connection together. For portable appliances, use suitable outdoor-rated leads within their load limits. Read the Queensland Electrical Safety Office’s generator guidance.

Further reading: Honda’s illustrative appliance guide · Pramac on load characteristics and generator sizing · Cummins application manual · WIA’s manufacturer welder specifications. Manufacturer instructions and site requirements take priority over a general guide.

A REAL PERSON WHEN YOU NEED ONE

Generator sizing questions

Not sure about a rating, a starting load or which option to choose? Send us your setup and we’ll help with the next step.

Get custom advice 1300 308 828
What size generator do I need for home backup?

Start with the appliances you need during an outage, not the number of bedrooms. A small essentials setup can be very different from a home with air conditioning, pumps or electric cooking. Use the guided questions for an initial range, then check the actual running and starting inputs. House circuits need a licensed electrician and a suitable changeover arrangement.

Is a 2 kVA generator enough for a fridge?

It can be, but the fridge’s starting demand is the deciding detail. Check both the generator’s continuous watts and its starting capability against the fridge manufacturer’s requirements. Other appliances running at the same time use some of that capacity. The 2 kVA model name alone is not a guarantee.

How do I convert amps to kVA?

For single phase, multiply voltage by current and divide by 1,000. For a balanced three-phase load, multiply line-to-line voltage by current per phase and by √3, then divide by 1,000. Use your equipment’s actual voltage. This gives apparent power; real power in kW also depends on power factor.

Can I convert kW to kVA by adding a fixed percentage?

Not reliably for every load. The relationship is kW = kVA × power factor. For example, 8 kW at a stated 0.8 power factor is 10 kVA. If power factor is unknown, the calculator keeps a watts-based answer in kW instead of presenting an invented kVA figure.

Why does an air conditioner or pump need a bigger generator?

A motor can demand substantially more power while starting than while running. The motor, compressor, starter and acceptable voltage drop all matter. A soft starter or variable speed drive changes the starting behaviour, but its presence does not establish a universal generator size. Use manufacturer input and starting data.

Which amps should I use for a welder?

Use electrical input current, commonly marked I1max, and the welder manufacturer’s recommended generator capacity. Welding output amps describe the welding circuit and cannot be substituted for input current. The supply phase, power factor, welding process and duty cycle also matter.

Can I buy the recommended generator online?

Where a current, priced generator matches the recorded requirements, you can add it to Cart and continue through our normal delivery and checkout process. Some larger or less defined setups need a quote or load check first. Your actual appliance starting loads, connections and installation still need to be suitable.

What if I don’t know any of the ratings?

Choose Help me choose for a simple application guide, or use Get custom advice to send us the basic details. A model number or clear nameplate information helps us check the equipment. You can also call 1300 308 828 and talk it through with a real person.